Services

From quote to tank in place

A quote within an hour, made-to-measure tanks, delivery to every region, crane placement, and a full technical submittal for projects.

The order path in five steps

  • Request: send the tank type, capacity and city by the form, WhatsApp or a call.
  • Quotation: written, within one working hour, Saturday to Thursday, with the installation guide and a dimensioned drawing for non-standard sizes.
  • Preparation: common sizes are in stock; other sizes take about a week, depending on the order.
  • Delivery: by our own trucks or carriers to any region, or collection from the factory, with crane placement on request.
  • Warranty: a certificate in your name with the invoice, 25 years against manufacturing defects, subject to the installation guide.

What Laura does, and what stays with your contractor

ServiceWhat Laura doesWhat stays with you or your contractor
QuotationWritten quote with the price before and after VAT, and delivery and crane as separate linesTank type, capacity, city and any site limits
Custom fabricationAny capacity on seven diameters, nozzles and partitions where specified, with a drawingReviewing the drawing before production starts
Technical submittalsData sheet, drawing, warranty letter and company documents on requestProject design and authority approvals, which remain with the consultant
DeliveryLoads the tank at the factory and transports it to your siteAccess for the truck and someone on site to receive the tank
Crane placementArranges the crane; the factory crew sets the tank in the pit or on the baseA finished pit or level base and firm standing for the crane
Installation guidanceA written guide with the burial conditions in figuresExcavation, blinding, sand bed, backfill, roof slab and plumbing

Where the factory's scope ends

Laura does not excavate, pour concrete or backfill, and the crew does not connect pipework or pumps. That work belongs to your contractor under the installation guide, and the warranty depends on following it. Give the guide to your contractor before excavation starts.

Frequently asked questions

Do you dig and install the tank?

No. We build the tank, deliver it and place it by crane on request. Excavation, base, roof slab and backfill belong to the site owner or contractor.

Is the crane included in the tank price?

No. Crane placement is a paid service shown as its own line and ordered only if you need it. You can also arrange your own crane.

How soon is the tank ready after I confirm?

Common sizes are in stock; other sizes take about a week, depending on the order. The delivery day is agreed when you confirm.

Can the technical documents arrive before the purchase order?

Yes. The drawing and data sheet come with the quotation for consultant review; other documents are prepared as the project requires.

Can I collect the tank from the factory?

Yes, with your own vehicle or a carrier you choose. We load the tank in the factory yard, and the quotation shows the ex-works price and the tank's dimensions.

WhatsAppCallEmailQuote