
Registrations, certificates and documents for your vendor file
For engineers and procurement: what the company holds, with the numbers, and what is sent with a quotation for GRP water tanks. Only documents on file are listed here.
- CR and VAT numbers
- Three numbered ISO certificates
- Documents with the quotation
- Reply in one working hour
We reply within one working hour, Saturday to Thursday.
Company registrations
These are the company's details as they appear on its records. Use them on your vendor registration form; copies of the documents themselves are sent with the quotation.
| Item | Value |
|---|---|
| Legal name (Arabic) | شركة مصنع لورا للصناعة |
| Legal name (English) | Masna Laura Company For Manufacturing |
| Brand | Laura Tanks |
| Commercial Registration (CR) | 2050167863 |
| Unified number | 7033415501 |
| VAT registration number | 310010521700003 |
| Factory location | Dammam Third Industrial City, Eastern Province, Saudi Arabia |
ISO management-system certificates
The factory holds three current ISO certificates. They cover the factory's management systems, not the tank as a product, so the tanks are not described as ISO-certified.
Copies of all three certificates are sent with the quotation on request.
| Standard | Management system | Certificate no. | Valid until |
|---|---|---|---|
| ISO 9001:2015 | Quality management | 24EQNY62 | 8 September 2027 |
| ISO 14001:2015 | Environmental management | 24EENB86 | 9 September 2027 |
| ISO 45001:2018 | Occupational health and safety | 24EONS74 | 10 September 2027 |
Documents sent with a quotation
State what your procurement file or the project consultant needs, and it is attached to the quotation.
The quotation and the tax invoice are issued in your entity's name with its VAT number.
- General arrangement drawing with dimensions and nozzle positions, prepared by the factory draughtsman.
- Tank data sheet: capacity, dimensions, wall thickness and openings.
- Installation guide, including the burial conditions for underground tanks.
- Warranty letter: 25 years from the invoice date against manufacturing defects, subject to the installation guide.
- Copies of the Commercial Registration, the VAT certificate and the three ISO certificates.
- Vendor registration documents on request: Chamber of Commerce certificate, GOSI certificate, Zakat and tax certificate, Saudization certificate and the industrial licence.
Confirmed in the quotation on request
Some requirements differ from one project to the next, so they are not promised on a general page. Name them in the request and the quotation answers each one in writing.
Laura does not state compliance with a standard, or registration with an authority, unless the document is on file.
- A standard named in the project specification: send the clause and the reply states what can and cannot be provided.
- A water fill test, where the specification calls for one.
- A delivery schedule in batches for large quantities.
- Any other document or registration your organisation asks for: the quotation confirms what is held at that date.
Frequently asked questions
Do the ISO certificates apply to the tank itself?
No. The three certificates cover the factory's quality, environmental and occupational health and safety management systems, not the product.
How do I check the certificate numbers shown here?
24EQNY62, 24EENB86 and 24EONS74 are the numbers of the three certificates. Ask for the copies with the quotation and match the number and validity date.
Can you supply a certificate of conformity to a named standard?
Laura does not state compliance with any standard for which it holds no document. Send the standard named in the specification and the quotation will say what can be provided.
What do you send for vendor registration?
Copies of the Commercial Registration, the VAT certificate and the ISO certificates, with the Chamber of Commerce, GOSI, Zakat and Saudization certificates and the industrial licence. If you use a vendor registration form, send it with the request and we complete it.
Do the drawing and data sheet arrive before the purchase order?
Yes. Both are sent with the quotation for submission to the project consultant; other documents are prepared as the project requires.
Related pages

Technical submittals
Data sheet, drawings and warranty with the quotation, on request.

Government tenders
Quotations for tenders and framework agreements, with the technical documents.

Contractors and developers
Tanks in project quantities to the specification, with a submittal for the consultant.

Warranty
25 years against manufacturing defects, and how to keep it.
Ready for your quote?
Send the type, capacity and city, and we reply within an hour.